Precision planning is crucial for every lifting of heavy equipment. To achieve this precision, each lifting procedure will be studied, simulated and converted into technical drawings using our company’s computerized system before the commencement of the lifting.
In the Titan Aromatic Plant Project at Pasir Gudang, Johore, the lifting of five units of Towers and Columns up to 83 Ton was simulated with technical drawings before we supplied one (1) unit of Manitowoc 4100 Series 1 Crawler Crane c/w Series 3 Ringer Attachment with 300 Ton lifting capacity, one (1) unit of 100 Ton Kobelco P&H 5100 Crawler Crane including the supply of under-hook appliances and our highly experienced manpower to supervise and carry out the heavy lifts in a challenging site condition.
In addition, we provided transportation for the mobilization and demobilization, manpower for the assembly and dismantling of cranes.