We were engaged to carry out the erection supervision and the supply of one (1) unit 160 Ton Kato NK 1600 Truck Crane, and one (1) unit heavy duty Prime Mover / Lowbed Trailer, together with our manpower & lifting gears for the exchange & relocation of the oversized exhaust sections ( Dimemsion : 6m x 6m x 7m with 28 mt) at Genting Sanyen power station.
This was a difficult and challenging task. One of the most difficult tasks in the shifting of the oversized exhaust section from the storage area to the installation site arised from the cramped condition when accessing to the site within the power station existing plant.
With our experienced transport crew and reliable Prime Mover/Lowbed Trailer we successfully loaded the oversized cargo and completed the shifting task in record time.