Project Overview

Plant Extension of KLK Olemas at Pulau Indah required to install 3 nos. Column 4.1 diameter x 27m long (60mt), equipment and steel structure. Trans Elite provide Demag AC 1600 All Terrain Crane (500 tonnes), P&H 5100 Crawler Crane (100 tonnes), LS 118RH5 Crawler Crane (50 tonnes) and 25 tonnes Rough Terrain Crane use to lift all the equipment and steel structure and complete within the schedule given.

Scope Of Works

  • Rigging studies with Autocad drawings.
  • Supply of One (1) unit 500 tonnes All Terrain Crane (Demag AC1600)
  • Supply of One (1) unit 100 tonnes Crawler Crane (P&H 5100)
  • Supply of One (1) unit 50 tonnes Crawler Crane (LS118RH5)
  • Supply of One (1) unit 25 tonnes Rough Terrain Crane
  • Supply of manpower, rigging supervisor and riggers to assist and supervise of the lifting operations.
  • Supply of necessary lifting appliances.
  • Category
Petrochemical
  • Location
Pulau Indah, Selangor
  • Key figure
3 x 60 t

Gallery

Could Your Project Be Next?

Tell us what you’re planning, and let’s explore the right solution to move your project forward.
Trans Elite
Head Office:
Showroom & Service Centre
No. 5, Jalan Sungai Kayu Ara 32/37,
Taman Perindustrian Berjaya,
Seksyen 32, 40460 Shah Alam,
Selangor Darul Ehsan, Malaysia.
© 1988 - 2026 Trans Elite Group Sdn. Bhd. [Co.No.:198801008410(175766-p)] - All Rights Reserved