
Kuala Lumpur to Putrajaya Highway
Infrastructure
130 t
Supply of a 400-tonne All Terrain Crane to Tanjung Langsat Port, Johor, for the unloading of oil and gas equipment. The crane was mobilised to the quayside and completed the vessel discharge operation over two days.
