For these Light Rail Transit (LRT) Line 3 project, we have supplied two (2) units 400 tonnes All Terrain Crane (Liebherr LTM1400 and Zoomlion ZAT4000), one (1) unit 500 tonnes…
With the biggest Tunnel Boring Machine (TBM) Front Shield weighing 159 mt, we were once again recognised by MMC Gamuda KVMRT for successfully lowering the Tunnel Boring Machine (TBM) and…
For the SUKE Highway’s package CB3, CB4, and CB5 in the years 2017 and 2019, we were given a heavy lifting job to lift precast T-Beam, precast Crosshead, and segmental…
In the Kuala Lumpur Monorail Project, our company had supplied various cranes ranging from 25 tonnes and 80 tonne Rough Terrain Cranes, 120 tonnes Crawler Crane to 300 tonnes Hydraulic…
We have been appointed by Leighton Contractors (M) Sdn Bhd as the beam launching contractor to execute the launching of T-Beams at Span 45 and Span 46. The launching of…
Zoomlion QUY650 (650 ton) crawler crane as main crane to lift and lower down the 128 ton Middle Shield of Tunnel Boring Machine (TBM). Zoomlion 650 ton crawler crane (QUY650)…
Lifting of Concrete U-Beam with 29 meter length & weight 66 tons for Acre Work Sdn Bhd. Project for DASH CB1. We provide our professional lifting studies to perform the…
Two (2) units 350 tonnes Crawler Crane (Manitowoc 4600 S5) rolling into the barge Singa Besar 2502 (70’ x 250’) at Port Klang. Penang Bridge Widening Project for Marine Launching…
Lifting of Steel Girder with 50.6 meter length & weight 120 tons for Preserver Bina Sdn Bhd. Project for West Coast Expressway (WCE Section 5) under main contractor IJM. We…