This single span Arch Pedestrian Bridge across SMART TUNNEL at the Jalan Imbi has dress weight of 150 metric tonnes and 70 meter long. To speed up the erection duration,…
In the construction of the Putrajaya Mosque, Tuck Sin Engineering and Construction Sdn Bhd (steel fabricator specialist) had worked together with Trans Elite for the steel erection works. In order…