<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Projects Archive - Trans Elite Group Sdn. Bhd.</title>
	<atom:link href="https://transelite.com/project/feed/" rel="self" type="application/rss+xml" />
	<link>https://transelite.com/project/</link>
	<description>Malaysia Crane Rental &#38; Trading Specialist</description>
	<lastBuildDate>Tue, 25 Feb 2020 10:41:43 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>

<image>
	<url>https://transelite.com/wp-content/uploads/2019/08/cropped-Favicon-1-32x32.png</url>
	<title>Projects Archive - Trans Elite Group Sdn. Bhd.</title>
	<link>https://transelite.com/project/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Demolition of Pedestrian Link Bridge at TRX, Kuala Lumpur</title>
		<link>https://transelite.com/project/demolition-of-pedestrian-link-bridge-at-trx-kuala-lumpur/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 10:20:09 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=5184</guid>

					<description><![CDATA[<p>SCOPE OF WORKS : Rigging studies with Autocad drawings. Supply of : One (1) unit 500 tonnes Truck Crane (Demag AC1600) Supply of : One (1) unit 300 tonnes Truck Crane (Liebherr LT1300) Supply of : One (1) unit 160 tonnes Truck Crane (Kato NK1600) Supply of manpower, rigging supervisor and riggers to assist and</p>
<p>The post <a href="https://transelite.com/project/demolition-of-pedestrian-link-bridge-at-trx-kuala-lumpur/">Demolition of Pedestrian Link Bridge at TRX, Kuala Lumpur</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>KVMRT SSP Titiwangsa Station</title>
		<link>https://transelite.com/project/kvmrt-ssp-titiwangsa-station/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 10:19:15 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=7065</guid>

					<description><![CDATA[<p>Zoomlion QUY650 (650 ton) crawler crane as main crane to lift and lower down the 128 ton Middle Shield of Tunnel Boring Machine (TBM). Zoomlion 650 ton crawler crane (QUY650) as main crane and Zoomlion 180 ton crawler crane (QUY180) as tailing crane to lift and tilt the TBM shield into vertical position before lowering</p>
<p>The post <a href="https://transelite.com/project/kvmrt-ssp-titiwangsa-station/">KVMRT SSP Titiwangsa Station</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>The Highway Privatization Project  Damansara-Shah Alam</title>
		<link>https://transelite.com/project/the-highway-privatization-project-damansara-shah-alam/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 10:18:24 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=7094</guid>

					<description><![CDATA[<p>Lifting of Concrete U-Beam with 29 meter length &#38; weight 66 tons for Acre Work Sdn Bhd. Project for DASH CB1. We provide our professional lifting studies to perform the heavy lift with using our two (2) units mobile crane Zoomlion QAY200 ( 200T mobile crane with 72 ton counterweight ).</p>
<p>The post <a href="https://transelite.com/project/the-highway-privatization-project-damansara-shah-alam/">The Highway Privatization Project  Damansara-Shah Alam</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>Linde Hicom ASU 5 Project</title>
		<link>https://transelite.com/project/linde-hicom-asu-5-project/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 10:17:37 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=7054</guid>

					<description><![CDATA[<p>In March 2018, the QUY650 Zoomlion 650-ton crawler crane operated by Trans Elite Group made its debut lift at the Linde plant in Hicom,Shah Alam, where it was tasked with hoisting a 40.3mm tall, 120 tonne Rectifier Cold Box tower into its designated position.The crane’s 66.0m S configured boom was used in a 16.0m operating</p>
<p>The post <a href="https://transelite.com/project/linde-hicom-asu-5-project/">Linde Hicom ASU 5 Project</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>Patrol Boat Lifting</title>
		<link>https://transelite.com/project/patrol-boat-lifting/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 10:16:38 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=4095</guid>

					<description><![CDATA[<p>Ship builders, NGV was responsible to fabricate the Patrol Boat, “Angsar”. CFW Enterprise engaged Trans Elite to lift the Patrol Boat weighing 150mt from the wharf to the sea using a 500 tonne Truck Crane (Demag AC1600) and a 300 tonnes Truck Crane (Liebherr LT300). The lifting works was successfully completed in only 1/2 an</p>
<p>The post <a href="https://transelite.com/project/patrol-boat-lifting/">Patrol Boat Lifting</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>Maari Project Lumut</title>
		<link>https://transelite.com/project/maari-project-lumut/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 10:15:54 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=4900</guid>

					<description><![CDATA[<p>Lifting of a 86 Tonnes Helideck for the Maari Project in Lumut for the Transerve Group of Companies. The scope broadly involves raising / lifting down of the Helideck of the TRAM module roof using one (1) unit of Demag AC1600 and a 500T mobile crane with 40.2m main boom c/w 140T counterweight attached to</p>
<p>The post <a href="https://transelite.com/project/maari-project-lumut/">Maari Project Lumut</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>KLK Olemas &#8211; Pulau Indah</title>
		<link>https://transelite.com/project/klk-olemas-pulau-indah/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 10:14:22 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=4058</guid>

					<description><![CDATA[<p>Petrochemical / Oleo Chemicals Plant Plant Extension of KLK Olemas at Pulau Indah required to install 3 nos. Column 4.1 diameter x 27m long (60mt), equipment and steel structure. Trans Elite provide Demag AC 1600 All Terrain Crane (500 tonnes), P&#038;H 5100 Crawler Crane (100 tonnes), LS 118RH5 Crawler Crane (50 tonnes) and 25 tonnes</p>
<p>The post <a href="https://transelite.com/project/klk-olemas-pulau-indah/">KLK Olemas &#8211; Pulau Indah</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>Kuala Lumpur &#8211;  Putrajaya Highway</title>
		<link>https://transelite.com/project/kuala-lumpur-putrajaya-highway/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sun, 01 Sep 2019 10:13:41 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=5086</guid>

					<description><![CDATA[<p>We have been appointed by Leighton Contractors (M) Sdn Bhd as the beam launching contractor to execute the launching of T-Beams at Span 45 and Span 46. The launching of beams at these two spans are the most difficult in terms of a limited working area available, very far working radius, longest beam (50 meter)</p>
<p>The post <a href="https://transelite.com/project/kuala-lumpur-putrajaya-highway/">Kuala Lumpur &#8211;  Putrajaya Highway</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>Putrajaya Mosque Erection of Steel Trusses</title>
		<link>https://transelite.com/project/putrajaya-mosque-erection-of-steel-trusses/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sat, 31 Aug 2019 10:19:22 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=5186</guid>

					<description><![CDATA[<p>In the construction of the Putrajaya Mosque, Tuck Sin Engineering and Construction Sdn Bhd (steel fabricator specialist) had worked together with Trans Elite for the steel erection works.In order to speed up the erection time and to avoid the installation of a temporary tower, Trans Elite’s Engineering Department had come up with the rigging studies</p>
<p>The post <a href="https://transelite.com/project/putrajaya-mosque-erection-of-steel-trusses/">Putrajaya Mosque Erection of Steel Trusses</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
		<item>
		<title>Penang Bridge Widening Project for Marine Launching Works</title>
		<link>https://transelite.com/project/penang-bridge-widening-project-for-marine-launching-works/</link>
		
		<dc:creator><![CDATA[kartunisdesa]]></dc:creator>
		<pubDate>Sat, 31 Aug 2019 10:18:55 +0000</pubDate>
				<guid isPermaLink="false">https://transelite.com/?post_type=project&#038;p=5182</guid>

					<description><![CDATA[<p>SCOPE OF WORKS : Two (2) units – 350 tonnes Crawler Crane (Manitowoc 4600 S5). One (1) unit – 70ft x 250ft Heavy Duty Barge Singa Besar 2502 with 2 nos. double drum (10 tonnes) winch and 4 nos. 5 tonnes Anchor. One (1) unit – 1600 HP Tug Boat. One (1) unit – 1600</p>
<p>The post <a href="https://transelite.com/project/penang-bridge-widening-project-for-marine-launching-works/">Penang Bridge Widening Project for Marine Launching Works</a> appeared first on <a href="https://transelite.com">Trans Elite Group Sdn. Bhd.</a>.</p>
]]></description>
		
		
		
			</item>
	</channel>
</rss>
