Extension of the plant for Palm (Oleo) Klang required to lift and erect 12 nos. heavy equipment and steel structure. The heaviest unit, column weighing 77.6mt (3000mm ID x 34500mm long) was using our 300 tonnes Ringer crane to lift and erect onto steel structure assist with one (1) unit 160 tonnes Truck Crane for tailing and upright the column into vertical position.