We were engaged to carry out the erection supervision and the supply of one (1) unit 160 Ton Kato NK 1600 Truck Crane, and one (1) unit heavy duty Prime Mover / Lowbed Trailer, together with our manpower & lifting gears for the exchange & relocation of the oversized exhaust sections ( Dimemsion : 6m x 6m x 7m with 28 mt) at Genting Sanyen power station.