Load out of the Suction Anchor (148mt) and Gem Manifold (143mt) on to the barge at West Port using two (2) units 500 tonnes Truck Crane (Demag AC1600).
SCOPE OF WORKS:
Rigging studies with Autocad drawings.
Supply of : Two (2) units 500 tonnes All
Supply of : Terrain Crane (Demag AC1600)
Supply of manpower, rigging supervisor and riggers to assist and supervise of the lifting operations.