Previous slide
Next slide
In the LRT Project, we supplied one unit of 300 Ton Liebherr LT 1300 Hydraulic Truck Crane with technical drawings and our manpower to supervise and carry out the lifting and positioning of 90 Ton Tunnel Boring Machine into a underground tunnel.