Our professional services have been called upon to take part in mega infrastructure projects such as the Kuala Lumpur Monorail and LRT projects.
During the Kuala Lumpur Monorail Project, our company has supplied various cranes ranging from 25 Ton and 80 Ton Rough Terrain Cranes, 120 Ton Crawler Crane to 300 Ton Hydraulic Truck Crane and Crawler based Ringer Crane for the lifting and launching of concrete guide-way beams, station spine beams at various sites in Kuala Lumpur and Rawang Test Track. Our scope of work was to supply experienced manpower, technical drawings, mobilization & demobilization, assembly & dismantling of cranes, Multi Axles Hydraulic Platform trailers and low loaders for the transportation of the beams.
- Erection of steel arch bridge (KL Monorail) over the KL Elevated Highway at Jalan Sultan Ismail.
- Erection of guideway beams, station spine beams and test track beam at Rawang.
- Supply of heavy transportation for the delivery of curved guideway beams, station spine beams and test track beam to the various site in Kuala Lumpur and Rawang Test Track.
Previous slide
Next slide