Lifting & lowering TBM components with heaviest item (TBM Front Shield) weighing 159T at Cochrane MRT Station using 300Ton Ringer Craneassisted by 1 unit 150Ton Crawler Crane for tailing to upright the components. All TBM components to be lift & lower down 30meter depth inside Cochrane Station.