Sewage Treatment Plant Project

Infrastructure

Previous
Next
We have secured a heavy lifting job to supply one (1) unit Prime Mover complete with Multi-axle trailer, two (2) units 300 Tons Truck Crane to off load two (2) units of Tunnel Boring Machine from the vessel at West Port and provide transportation of the Tunnel Boring Machines to the jobsite at Jalan Pantai Dalam & Brickfields. Upon arrival at the jobsite, these two TBM is lifted by two (2) units 300 Tons Truck Crane from the Multi-axle trailers and lowering into the pit hole which our job include the supervision and final alignment on to the track. Rigging studies with supporting drawings are prepared and issued by us in order to analyze and plan the lifting procedures before commencing the project.
You can`t add more product in compare

KA1200 KATO 120T

ZR280C ZOOMLION DRILLING RIG - VAV 6129

60T Rough Terrain Crane - RTT60 - 0261

60T Rough Terrain Crane - RTT60 - 0250

60T Rough Terrain Crane - RTT60 - 0259

60T Rough Terrain Crane - RTT60 - 0258

60T Rough Terrain Crane - RTT60 - 0257

ZR280C ZOOMLION DRILLING RIG - WC 6992 B

ZR280C ZOOMLION DRILLING RIG - VAV 9216

AC100 DEMAG 100T

ZR280C ZOOMLION DRILLING RIG - BPS 8639

ZMC85 ZOOMLION 85T - VE8860

ZMC85 ZOOMLION 85T

ZMC60 ZOOMLION 60T

ZOOMLION 85T

AC200-1 DEMAG 200T

55T Rough Terrain Crane