
Kuala Lumpur – Putrajaya Highway (Night)
A steel box girder being lifted by one (1) 500 tonnes Truck Crane ( Demag AC1600 ) was placed on top of Pier 12.The steel

A steel box girder being lifted by one (1) 500 tonnes Truck Crane ( Demag AC1600 ) was placed on top of Pier 12.The steel

Lifting of Steel Girder with 50.6 meter length & weight 120 tons for Preserver Bina Sdn Bhd. Project for West Coast Expressway (WCE Section 5)

Our professional services have been called upon to take part in mega infrastructure projects such as the Kuala Lumpur Monorail and LRT projects. During the

On 19 April 2002, the first locally made KL Monorial train was successfully lifted onto the track at the Jalan Maharajalela Station by our company

We have secured a heavy lifting job to supply one (1) unit Prime Mover complete with Multi-axle trailer, two (2) units 300 Tons Truck Crane

In the LRT Project, we supplied one unit of 300 Ton Liebherr LT 1300 Hydraulic Truck Crane with technical drawings and our manpower to supervise

Lifting & lowering TBM components with heaviest item (TBM Front Shield) weighing 159T at Cochrane MRT Station using 300Ton Ringer Craneassisted by 1 unit 150Ton

Lifting TBM components with heaviest item (TBM Front Shield) weighing 137T at Semantan using 300Ton Ringer Crane & assisting by 1 unit 160Ton Crawler Crane

Erection of overhead Gantry Crane using 160Ton Crawler Crane / 200Ton Crawler Crane and 160ton Truck Crane.

Shipment of Piling machines, Diesel Piling Hammers and parts for export to Africa.