SCOPE OF WORKS : Rigging studies with Autocad drawings. Supply of : One (1) unit
Zoomlion QUY650 (650 ton) crawler crane as main crane to lift and lower down the
Lifting of Concrete U-Beam with 29 meter length & weight 66 tons for Acre Work
In March 2018, the QUY650 Zoomlion 650-ton crawler crane operated by Trans Elite Group made
Ship builders, NGV was responsible to fabricate the Patrol Boat, “Angsar”. CFW Enterprise engaged Trans
Lifting of a 86 Tonnes Helideck for the Maari Project in Lumut for the Transerve
Petrochemical / Oleo Chemicals Plant Plant Extension of KLK Olemas at Pulau Indah required to
We have been appointed by Leighton Contractors (M) Sdn Bhd as the beam launching contractor
In the construction of the Putrajaya Mosque, Tuck Sin Engineering and Construction Sdn Bhd (steel
SCOPE OF WORKS : Two (2) units – 350 tonnes Crawler Crane (Manitowoc 4600 S5).
A steel box girder being lifted by one (1) 500 tonnes Truck Crane ( Demag
Lifting of Steel Girder with 50.6 meter length & weight 120 tons for Preserver Bina
Our professional services have been called upon to take part in mega infrastructure projects such
On 19 April 2002, the first locally made KL Monorial train was successfully lifted onto
We have secured a heavy lifting job to supply one (1) unit Prime Mover complete
In the LRT Project, we supplied one unit of 300 Ton Liebherr LT 1300 Hydraulic
Lifting & lowering TBM components with heaviest item (TBM Front Shield) weighing 159T at Cochrane
Lifting TBM components with heaviest item (TBM Front Shield) weighing 137T at Semantan using 300Ton
Erection of overhead Gantry Crane using 160Ton Crawler Crane / 200Ton Crawler Crane and 160ton
Shipment of Piling machines, Diesel Piling Hammers and parts for export to Africa.
Loading of Tadano Rough Terrain Crane to the vessel for export to Middle East.
Trading of Construction Equipment Export for sales to Sudan for a fleet of eight (8)
In July 2009, we again being awarded by IMPSA (M) Sdn Bhd to provide our
Load out of the Suction Anchor (148mt) and Gem Manifold (143mt) on to the barge
Our company was engaged to supply cranes ranging from 25 Ton to 300 Ton Hydraulic
In 2002, our company was engaged to supply experienced manpower, cranes, tools and equipment to
We provide manpower (rigging supervisor, riggers, crane operators), two (2) units 300 Tons truck cranes
Lifting of 1 unit Deaerator Vessel 5364mm diameter x 23m long (135mt) by one (1)
The 100 tonnes cutter ladder of the dredging barge was lifted by one (1) unit
Lifting of Cold Box and Vessel for Air Product Sdn Bhd for Ann Joo Steel
In October 2007, we undertook an urgent & critical Heavy Lift Project offshore on the
We were engaged to carry out the erection supervision and the supply of one (1)
Our company was awarded the Contract to Supply Crawler Cranes ranging from 200MT to 450MT,
We were engaged to carry out a very complicated tandem lift to erect one unit
We have secured a heavy lifting project to lift and erect one (1) unit 7mØ
Petrochemical / Oleo Chemicals Plant SCOPE OF WORKS: Rigging studies with Autocad drawings. Supply of
Replacement Of E1801-Reactor (125mt) At Petronas Refinery Kedah Petrochemical / Oleo Chemicals Plant In the
Petronas Fertilizer Plant at PFK, Guran Petrochemical / Oleo Chemicals Plant Our company was called
PML-Plant Rejuvenation at Labuan Petrochemical / Oleo Chemicals Plant We provide manpower (rigging supervisor, riggers,
Our company Trans Elite also provided services for assessing crane counter weight load test from